New City Thủ Thiêm

Apartment · For Sale

The project of Thu Thiem planning (District 2, Ho Chi Minh City) has become a modern urban area since 1996, and after 20 years, the wasteland has gradually become a new urban center. At present, in addition to completed projects, a number of new projects are under construction. Thu Thiem is planned to be a new sustainable urban area in close combination with the natural landscape of Thu Thiem; At the same time, create more open space, utilities, public works for the life of residents and workers.

Traffic in Thu Thiem urban area: Fully planned with key investment infrastructure. Construction of four major roads: the boulevard of the arc, the centerline of the river, the riverside of Sai Gon river and the delta road through the southern forest ecological area.In addition, Thu Thiem urban area will build Thu Thiem 2 and 4 bridges once tunnels and Thu Thiem bridges have been built to ensure traffic connections with the existing downtown. Currently, Thu Thiem 2 Bridge is being built by the investor, expected to be completed in June, 2018.

Green landscape in Thu Thiem new urban area: Thu Thiem new urban area is planned for the purpose of building a modern urban area interlaced with green space to help future residents can enjoy the fresh and cool climate along with the conveniences. level. Particularly, Thu Thiem has a function area of 8, ecological forest – air fresh, green leaf for Thu Thiem, so that every day in this place is full of sun and wind.

Facility

  • Parking
  • BBQ
  • Elevator
  • Department store
  • Pool
  • Living room
  • Gym room
  • Park
  • Security 24/7

Features

Additional details

Traffic in Thu Thiem urban area: Fully planned with key investment infrastructure. Construction of four major roads: the boulevard of the arc, the centerline of the river, the riverside of Sai Gon river and the delta road through the southern forest ecological area.
In addition, Thu Thiem urban area will build Thu Thiem 2 and 4 bridges once tunnels and Thu Thiem bridges have been built to ensure traffic connections with the existing downtown. Currently, Thu Thiem 2 Bridge is being built by the investor, expected to be completed in June, 2018.

Floor Plan

Location

Mai Chí Thọ, Bình Khánh, Quận 2, Hồ Chí Minh, Việt Nam

Attachments

Agent

Contact

Name (required)

Email (required)

Phone

You message

Message has been sent successfully.

Similar Properties (95)